Prevent the leakage of corrugated steel culvert

Feb. 27, 2017

When we were on the butt of corrugated steel culvert, must ensure that the air tightness of the interface. If the error caused by the leakage of corrugated steel culvert in sideways in the whole project in the next docking, greatly shorten the service life of the project.

When the steel corrugated culvert at both ends of the butt some strength is not high, advocates the adoption of bonding method and soldering way to butt on the corrugated steel pipe culvert. Because it can do very fine processing of corrugated steel culvert on the interface without.

We can also supply the corrugated metal pipe, spiral corrugated pipe etc. If you need the high quality products, welcome to contact us.

corrugated steel culvert

Other Blog

  • Highway ConstructionHighway Construction
  • Mine ProjectionMine Projection
  • Municipal EngineeringMunicipal Engineering
  • Irrigation EngineeringIrrigation Engineering
  • Railway Construction ProjectionRailway Construction Projection
  • Other ApplicationOther Application

Do you need a project solution?

With first-class products and services, and make greater contributions

WeChat
WeChat